Six Sigma Results

From 2001 to 2022, a total of 233 Six Sigma projects were completed, with 7 BB and 196 GB trained.

Implementation Results
Project Classification Statistics
Detailed Description Project Count Ratio%
Q:Quality 76 31.7%
C:Cost 104 43.3%
D:Delivery Time 33 13.8%
A:Administrative Management 26 10.8%
O:Others 1 0.4%
Total 240 100.0%
Statistical Period: From 2001 to 2023

Best Project

Annual Project Team Leader Project Name
2019 An Hsiang Lin Improve the Delivery Quality Yield of the Outer Shell
2020 Kun Sung Wu Reduce External Failure Costs in the Motor Department
Ming Hsiang Yeh Establish a New Production Line for Gas-Sealed Switches and Improve Work Efficiency
2021 Wan Yu Chiu Reduce the Procurement Processing Time for General Purchase Orders by 25%
2022 Hsien Hao Tsai Combine Technology and Process Improvements in Distribution Transformers to Reduce Costs by 5%
Shih Shuang Huang Increase the 2022 Distribution Panel Order Gross Profit by More Than 5%
Peter Shieh/Jerry Liu Maximize the Staged Gross Profit of TPC Mass Production Iron Loss with AI + IoT
2023 Jane Sun/Kevin Liao Achieve the Estimated Gross Profit Margin for Project Orders
Jen Feng Huang Utilize Big Data Database to Reduce Material Usage in Export Mass Production Transformers
Roy Su Reduce the Discrepancy Between Quoted and Actual Material Usage in Power Transformers
Note: The above projects have been recognized as the Best Projects in the past(Evaluation has been implemented since 2007).

Latest News

Project Team Leader Project Name
Wen Liang Chung Accuracy of Oil Volume Estimation in Power Transformer Quotations
Amos Yeh Reduce Quotation Labor Hours by 20%
Charles Wu Reduce Material Costs for the Overvoltage Protection Device Panel of the MRT DC Traction Power Equipment
Jill Chuang Increase the CD Efficiency of Production Equipment Procurement by 5%
Steven Li Improve the Scheduling Accuracy of Mass Production
邱信良 Improve the Quality of Testing Work
Wen Yu Liu Improve Work Efficiency in KIT Pre-Assembly by 10%
Chih Kai Cheng The Moisture Content of Insulation Materials in Export Transformers Must Meet Specification Requirements
Ci Jyun Chen Reduce Silicon Steel Scrap by Over 10%
Leo Feng Reduce Wiring Error Rate
Rex Lin Reduce the Copper Busbar Usage in Market Distribution Panels by 5% (Above 2000A)

Implementation Results Presentation